ABB Limited

Address:
Auriga House
Precedent Drive
Rooksley
Milton Keynes

MK13 8PQ
United Kingdom

Phone: 01925 741 111

Fax: 01925 741 212

Web: www.abb.com


ABB Limited articles

Displaying 1 - 5 of 5

Energy storage solution for offshore wind farm

Energy storage solution for offshore wind farm
Denmark-based sustainable energy group, DONG Energy, is set to take delivery of a two megawatt (MW) Battery Energy Storage System (BESS) from ABB to support the integration and transmission of power from the Burbo Bank offshore wind farm near Liverpool.
6th September 2017

Grid stabilisation technology enhances power reliability

Grid stabilisation technology enhances power reliability
An order for around $30m from the Dutch-German transmission system operator, TenneT has been given to ABB to supply a stabilisation solution that will enhance the reliability and quality of power as the grid absorbs more renewable energy. The order was booked in the second quarter of 2017.
15th August 2017

Microgrid supports renewable energy transition in Aruba

Microgrid supports renewable energy transition in Aruba
An advanced microgrid will be provided by ABB to WEB Aruba N.V., the main power utility serving the Dutch Caribbean island of Aruba. ABB’s software, automation and control technologies will help WEB Aruba integrate solar and wind energy, forecast and plan better and optimise operations in real-time, while meeting Aruba’s growing demand for electricity. The island is 32km long and 10km across its widest point. It has a land area of 179km2 and a population of about 103,000 inhabitants.
12th July 2017


ABB enables power flow from solar park in Dubai

ABB has energised a major substation that will help evacuate power from the Mohamed Bin Rashid Al Maktoum (MBR) Solar Park, a key element of the vision to generate 7% of Dubai’s power from clean energy sources by 2020; 25% by 2030, and 75% by 2050. The 400/132 kV gas-insulated switchgear (GIS) substation has been built for Dubai Electricity & Water Authority (DEWA), the UAE’s leading power utility, to connect the second phase of the MBR Solar Park and integrate 200 MW of electricity to the transmission grid.
15th February 2017

ABB’s energy harvesting wireless temperature transmitter ‘could go on forever’

Novel energy harvesting technology from ABB is enabling Robinson Brothers to make remote temperature measurements without the need for a power supply to the transmitter. Combined with WirelessHART communications technology, this eliminates the need for any cabling to the instrument.
9th October 2012


Sign up to view our publications

Sign up

Sign up to view our downloads

Sign up

POWER & ENERGY 2017
22nd November 2017
Rwanda Kigali